CASE STUDY



next up previous
Next: A real-life voltage Up: Contingency severity assessment for Previous: MULTILAYER PERCEPTRONS

CASE STUDY

Below we summarize a broad study carried out on the EHV system of Electricité de France (EDF), commenting briefly on the physical problem and the overall scope of the study, in terms of operating conditions and contingencies, before discussing the case of three contingencies of increasing complexity.






Wed Jan 18 20:00:51 MET 1995